STAXLI SAMPLE PACKAGE (SYNTHETIC)

This is a synthetic test job, not a real project. Every drawing it was made from is
synthetic, and the reading step ran on scripted test models. No customer data is in it.

Job:      SYN-001 Portal-frame shed (3 portal frames, 12 members)
Run date: 27 October 2026

What happened
  Run 1: the drawings did not state the connection plates, so 15 RFIs were raised
         instead of guesses. See rfi-report-run1/.
  The engineer's (synthetic) answers were recorded.
  Run 2: 0 RFIs. A Checker approved the model, the drawings and the package.

Folders
  model/            IFC4 model and STEP
  nc1/              NC1/DSTV files for 7 parts, and their manifest
  drawings/         assembly and part drawings, PDF and DXF
  lists/            bolt list, purlin schedule, KISS parts file
  rfi-report-run1/  the 15 RFIs from run 1, PDF and CSV

Note
  Developer notes from the test harness were removed from the run-1 report.
  The 15 RFIs are as raised; the review flags are reworded in plain English.